topline

topline
toplineart


logo
current new views
(Look at "Current Status" for monthly updates)

Creating A Future

Faith Lutheran Church is GROWING! Current Sunday worship attendance is regularly 300 people. Nursery and SundayBuilding on Faithy School classes are offered during the services and classrooms are overflowing. The Sunday contemporary service is thriving. Five Christmas services and numerous Christmas pageants bring joy to hundreds. Additional pastoral supports, including an associate pastor and youth minister have been added. With 780 baptized members and 260 of those being between infancy and senior high school age, FAITH’s youth programs and ministries for all ages are flourishing!

FAITH is an “all week” church filled with Bible study groups, music ministries, workshops, classes, retreats, the Logos Program, Youth Serving God, Altar Guild, Prime Timers, Empty Nesters, First Communion and Confirmation classes, a high school group, Vacation Bible School, social fellowships, ministries and outreach programs.

Our current sanctuary, fellowship hall, meeting rooms and offices are being strained to accommodate all our needs for worship, fellowship, ministry and Christian education. What a blessing for FAITH to be serving more children, more individuals and more families!

Current Status of the Project

Frequently Asked Questions (FAQs)


Current Status

September 2008
The early site plan (Parking, drainage, roads, walkways, etc.) is complete but needs to be modified to meet our needs and budget. The BOF committee met with the Town of Andover officials and boards this month to "informally" present our plans. There was good discussion and suggestions made which we will make part of our formal proposal when we apply for permitting. The 3-D model of the new building is now available to view in the narthex of the church
August 2008
The schematic plan (concept) is more detailed now.  The wetlands have been defined by the civil engineer and a plan to handle storm water runoff is in the early design stage. A Three dimensional model of the new building plan, as developed so far, has been donated by Faith member, Craig Calson's company, InDepth Design. Construction of this model is underway and will be available in September.
July 2008
Great progress has been made! We now have a plan with the sanctuary in the back of the property to avoid front setback issues and moved south to avoid the wetland setback concerns. We also have hired a civil engineer to work on the site plan, drainage and other issues.  The new sanctuary will have an entrance south of the existing entrance. Check out early views of the footprint here.
June 2008
Various options have been explored for the placement of the Sanctuary both for "traffic flow", visual impact and meeting town concerns. The plan to place the sanctuary out front requires town approval (variance) since it violates the front setback distance, the plan to place the sanctuary in the back violates the wetlands setback distance. Other placement options are being considered.
May 2008
The architects (Maugel, Architects http://www.maugel.com/ ) are in the schematic design phase. This means that they are designing the new spaces, reusing existing spaces and solving problems with location of important functions. They along with the"Building on Faith" or BOF committee need to secure Town of Andover approval for the new design.  The total cost for the project is only partially defined and there are some decisions that need to be made such as how close can we build to property lines and to the wetlands in the back of the property. Fund raising is continuing and the more we can raise the better off we are both in making these choices as well as reducing any need to take out a mortgage.

Views of the New Facilities

We are Expanding our space to support our ministries. The project is called "Building on Faith" or BOF and adds new space and reuses existing space to meet these needs. An early concept of the plan is now available for viewing. There are two plans-- a "Master Plan" that fills the planning needs listed by the committee and a "Phase One" plan that meets many needs and, we hope, can be built with funds of our pledge goal. If additional construction monies are made available (more pledges, bonds, loans), additional work "Phase Two" and "Phase Three" are possible.




outviews

inviews


The views are footprints and floor plans, 3-D model views and Computer drawings. These views are not created by the architects but are created by BOF members. The quality is less than views and presentations by the architects but , we hope, is helpful to your understanding of the project. There will be changes made as new ideas are added and problems are solved. Click one of the buttons to the right to see what is planned so far.

 Note: for the 3-D model you need Microsoft Powerpoint.

FAQs

Why have phases?--The project has been divided into phases because the total construction cost for the master plan is greater than the funding pledged by the congregation. Phase 1 should be affordable with funds to be raised in our phase 1 funding program and adds important new worship space and frees up space in the old sanctuary for many other programs needs. Additional needs can be met (phase 2 and phase 3), if additional funds are provided.

What is in phase 1?--Phase 1 builds a new 250 person sanctuary. The parking and drop off driveway is moved. New bathrooms (handicap accessible) are built. The "old" sanctuary space becomes a large gathering/flex space to support fellowship, youth and Christian education. The kitchen, choir, youth meeting and admin spaces will not change.  However, there may be a plan to move the nursery space into a corner of the old sanctuary to make it closer to worship and to give more space for admin. Other ideas for use of our new "flex" space are also being discussed.

When is Construction?--Construction will be timed to the weather and to minimize disruption to the worship and other programs of the church. Before we can start, the Town of Andover must approve our plans and a Congregational meeting is needed to approve construction and to determine which phases to fund.  Watch for these goals to be completed.

current  new views

   






Home
Location/Service Times
Contact Us
About Us
Our Ministries
Faith Weekly
Education
Coming Events
   CHURCH HAYRIDE
   11/14/2008
   Faith is having an ALLCHURCH Hayride! Nov. 14th at Boston Hills Farm!! Sign-up in the Lobby underneath the tissue paper fire! Cost is $10/person or $25/family which includes the hayride, cider, donuts and an evening of fun.
For information contact:
Church Office at (978) 475-4059

 
   SENIOR HIGH LOCK IN
   11/14/2008 to 11/15/2008
   FLY is having a Lock-in after the Hayride!! This event is for ALL 9- 12 grade students! Bring a snack to share and your Bible as well as a sleeping bag, pillow and whatever you might need for the night.
For information contact:
Church Office at (978) 475-4059

 
   NEWCOMERS GATHERING
   11/16/2008 | 6:30PM
   Faith Lutheran will hold a Newcomers Gathering dinner on Sunday, November 16 at 6:30 PM in our fellowship hall. This dinner is being sponsored by Faith’s Fellowship team.
For information contact:
Church Office at (978) 475-4059

 
   CHRISTMAS WORKSHOP
   11/20/2008
   PrimeTimers are invited to bring your nimble fingers for our annual Christmas centerpiece workshop and your voices for an Oldies Piano Sing along led by Helen Hamel.
For information contact:
Church Office at (978) 475-4059

 
   MIDDLE SCHOOL LOCK IN
   12/05/2008 to 12/06/2008
   Middle school students MARK YOUR CALENDARS!! December 5-6 we’re having a lock-in here at church from 7 p.m. to 10 a.m.
For information contact:
Church Office at (978) 475-4059